The President’s Report — 2026
Healthy Water, Healthy Woods: Project Updates
Our Vision & Goals
The Stockbridge Bowl Association’s future vision is focused on restoring, protecting and preserving the ecological integrity and natural beauty of the Stockbridge Bowl and Bullard Woods while enhancing the recreational value for our community
Restore the Bowl to an ecologically balanced state.
Protect the Bowl and Bullard Woods against invasion.
Preserve the native flora & fauna of the Bowl & Bullard Woods.
Stockbridge Bowl
The Stockbridge Bowl (Lake Mahkeenac) is owned by the Commonwealth of Massachusetts as a public "Great Pond“.
Oversight is handled by the Town of Stockbridge (Selectboard and Town Administrator), advised by the Stockbridge Bowl Stewardship Commission and the Conservation Commission.
The Stockbridge Bowl Association (SBA) works in close partnership with the Town to carry out its core mission of restoring, protecting and preserving the Stockbridge Bowl
Restoration & Dredging Project
Project Manager: Michael Canales, Town Administrator
Completed Milestones this Year – Bullard Woods
Isolated wetlands vegetation permitting
Geological survey in Bullard Woods to permit silt repository from planned dredging
Archeological survey did not find pre-contact era Native American artifacts that would have precluded using the Bullard Woods site
Restoration & Dredging | Next Phase
Project Manager: Michael Canales, Town Administrator
GZA Engineering
Environmental Review
Massachusetts Environmental Protection Act
Massachusetts Endangered Species Act
Natural Heritage and Endangered Species Act
State & Local Permitting
Notice of intent
Chapter 91 permit application
Water quality certification application
Stormwater pollution prevention plan
Engineering Design
Sediment dewatering site design
70% complete
These tasks represent the final planning and permitting efforts before the town can move to regulatory approvals and ultimately the implementation of the dredging project. Target start date is 2028.
Diver Assisted Suction Harvesting (DASH) for
Eurasian Watermilfoil
SBA Project 2026-2027
A mechanical method for removing invasive Eurasion Milfoil from designated areas of the Bowl
SBA has retained GEI for data collection and permitting
Permitting options will be based on plant density and distribution
Initial vegetative study completed in June
Pictured: Eurasian watermilfoil found during survey,
DASH | Survey Results & Next Steps
SBA Project 2026-2027
Overlay harvesting map with vegetative study map
Determine short- and long-term strategy for permitting
Submit Notice of Intent to Conservation Commission
Target for implementation is summer 2027
Water Chestnut Eradication Program
5th year of joint effort between SBA and town of Stockbridge
Number of plants removed:
2022 – 1350
2023 – 477
2024 – 187
2025 – 30
2026 – 33
Pictured: Left, Water chestnut (in yellow circle) hiding amongst dense white water lily growth. Right, underside of a water chestnut plant with immature nutlets.
Water Chestnut Eradication Program | Survey Results
Bullard Woods Update
SBA once again awarded a Community Preservation Act grant of $5000 to pull invasive plants
Ongoing trail maintenance
Installation of new dock
Boat Ramp Update
Mass Division of Wildlife and Recreation upgrades performed a renovation in May, 2027
The SBA partnered with the Town of Stockbridge on notifications
The SBA continues to support the Town in their diligent operation of the Zebra mussel monitoring station at the boat ramp
Before Restoration
After Restoration
Library Kayak Lending Program Sponsorship
The SBA previously had donated kayak racks for the Town beach
This year the SBA purchased a kayak rack and two additional kayaks dedicated for the Kayak Loan Program